Flat Roof Replacement Case Study

Project Overview

  • Client: Michael Regan
  • Location: Balham, London
  • Roof Type: Flat
  • Project Duration: 3 Days
  • Completion Date: 08/24

Client’s Problem

  • Leaks during heavy rain
  • Beyond Repair

The client contacted us after experiencing ongoing issues with a leaking roof. Upon inspection, we discovered the roof was old and beyond Repair.

Project Goals

Stop all leaks and ensure watertight protection with a Guarantee

Work Process

Step 1: Initial roof inspection and detailed estimate
Step 2: Preparation and removal of damaged materials
Step 3: Repair of roof base and structural elements
Step 4: Install new Triple Layer Felt Roof
Step 5: Final inspection and quality assurance

Results

  • Completion Time: 3 Days
  • Warranty Provided: 15 Years
  • Issues Resolved: Yes
     

 

Brand New roof that is now Waterproof and Leak Free - an example of our great flat roof replacement services.

Client Feedback